Month: November 2026

A large custom home under construction on a wooded Fox Chapel lot, with house wrap, an unfinished garage wing, a winding gravel driveway, and stacks of lumber among tall trees. The site is empty.

Builder’s Risk for a Fox Chapel Custom Home

A Fox Chapel project is often a custom house: a long calendar, several trades, a wooded lot, and a construction lender that wants to be named on a policy before the first draw. That is a different insurance conversation than a short occupied remodel. This article looks at what to review on a builder’s risk […]
Read more
A large gray stone house in a leafy Chestnut Hill setting, mid-renovation, with scaffolding along one wing, a chimney wrapped for protection, and a side drive. No people are in the yard.

Builder’s Risk for a Chestnut Hill Stone Home

A Chestnut Hill renovation often starts with the masonry. Many houses in the neighborhood are stone, and a project may involve opening a wall, repairing a slate or other specialty roof, or matching materials that are no longer sitting on a lumberyard shelf. Work like that can take longer than a standard frame job, and […]
Read more
An older brick and stone house mid-rehab on a steep Manayunk hillside street, with scaffolding on the downhill facade, a stone retaining wall, and lumber leaning against the wall. The sloping street is empty.

Builder’s Risk for a Manayunk Hillside Rehab

Manayunk projects often start with the slope. An older brick or stone house may sit above a retaining wall, with a narrow street on one side and a drop on the other. Getting a dumpster, a lumber package, or a lift to the right elevation can take as much planning as the interior work. This […]
Read more